Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    Ibom FocusIbom Focus
    Subscribe
    • Homepage
    • About Us
    • Big Story
      • Crime
      • General News
      • Foreign News
      • Education
      • Politics
    • Disclaimer
    • Corrections Policy
    • Editorial Policy
    • Terms and Conditions
    • Privacy Policy
    • Contact Us
    • Homepage
    • About Us
    • Big Story
      • Crime
      • General News
      • Foreign News
      • Education
      • Politics
    • Disclaimer
    • Corrections Policy
    • Editorial Policy
    • Terms and Conditions
    • Privacy Policy
    • Contact Us
    Ibom FocusIbom Focus
    • Homepage
    • About Us
    • Big Story
    • Disclaimer
    • Corrections Policy
    • Editorial Policy
    • Terms and Conditions
    • Privacy Policy
    • Contact Us
    Home»News»Business»TCN Begins The Construction Of A Turn-In Turn-Out To Connect The New Bauchi Transmission Substation to the Grid
    Business

    TCN Begins The Construction Of A Turn-In Turn-Out To Connect The New Bauchi Transmission Substation to the Grid

    Ibom FocusBy Ibom FocusJune 12, 2025No Comments2 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email
    SHARE THIS:
    TCN Begins The Construction Of A Turn-In Turn-Out To Connect The New Bauchi Transmission Substation to the Grid

    The Transmission Company of Nigeria (TCN) has commenced the construction of a turn-in-turn-out along the 330kV Jos-Bauchi-Gombe transmission line to connect the new Bauchi 330kV Transmission Substation to the grid. Work began today, June 10, 2025, and is expected to be completed by June 14, 2025.

    During the construction period, Gombe and Biu Transmission Substations will receive power through the Dadin-Kowa Hydro Power Plant and Maiduguri Substation, supported by the Maiduguri Emergency Power Plant (MEPP). As a result, there will be a temporary reduction in bulk electricity supply to Jos and Yola Electricity Distribution Companies for onward distribution to their customers in Bauchi, Gombe, Ashaka, Savannah, Damaturu/Potiskum, and Biu. Only Yola and Jalingo will, however, experience full power outages during the five-day project duration.

    A new transmission tower is also being installed to enhance the resilience and flexibility of the network, allowing the Bauchi and Gombe Substations to act as mutual backups in the event of maintenance or fault Additionally, Jos will be able to supply Bauchi Substation directly through a 132kV transmission line whenever the primary 330kV connection via Gombe is unavailable. This arrangement enhances power reliability, diversifies transmission routes, and improves emergency response efficiency.

    TCN remains committed to strengthening Nigeria’s electricity infrastructure to facilitate a more stable and effective bulk power supply. The company appeals for the patience of affected consumers during the period and assures that normal electricity delivery will resume immediately after the project’s completion.

    SHARE THIS:
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Ibom Focus
    • Website

    Related Posts

    Petrol Hits N1,900/Litre Days After FG Announces N50 Reduction

    October 10, 2026

    BREAKING: No Substantial Reason to Stop New Tax Laws — Tinubu Blows Hot

    December 30, 2025

    How Muslims Exempted From Tinubu’s Tax Payment 

    December 24, 2025
    Tag Cloud
    2024 Budget AFCON 2023 APC Army Assassination Catholic Church CBN Christian Genocide Climate Change Coup Plot Crude Oil Davido Donald Trump Economic Hardship EFCC Election Results Flat Earth Fuel Subsidy Future of News Golden Globes Gyado T Emmanuel Lawmaker Market Stories Minimum Wage Ministerial Appointment Ministerial List Mohbad MotoGP 2017 Mr. Robot NAF Nationwide Strike NLC President Obasanjo PDP PDP Chairman Pregnant Woman Presidential Election Presidential Yacht Rivers Crisis Senate Sillicon Valley Terrorists Tinubu United Stated US




    Recent Posts
    • Two Suspected Ekpo Masqueraders Arrested Over Alleged Extortion In Akwa Ibom October 28, 2026
    • Customs Vows to Sustain Nigeria’s Gains After FATF Grey List Exit October 28, 2026
    • FG Orders NSCDC Reforms as Probe Confirms Deaths of 33 Detainees, Including 14 Minors October 28, 2026
    • Police Arrest Fake Lawyer Who Allegedly Practised for 11 Years, Recover Fake Certificates October 28, 2026
    • Finance Ministry Gets New Acting Permanent Secretary as Omachi Bows Out October 28, 2026
    Search
    Ibom Focus
    Facebook X (Twitter) Instagram Pinterest Vimeo YouTube
    © 2026 Ibom Focus. Designed by Domo Tech Media.

    Type above and press Enter to search. Press Esc to cancel.