Close Menu
  • Home
  • Akwa ibom
  • Big Story
  • Education
  • Recruitment
  • Uncategorized
Facebook X (Twitter) Instagram
  • About Us
  • Disclaimer
  • Corrections Policy
  • Editorial Policy
  • Terms and Conditions
  • Privacy Policy
  • Contact Us
Facebook X (Twitter) Instagram
Ibom FocusIbom Focus
Subscribe
  • Homepage
  • About Us
  • Big Story
    • Crime
    • General News
    • Foreign News
    • Education
    • Politics
  • Disclaimer
  • Corrections Policy
  • Editorial Policy
  • Terms and Conditions
  • Privacy Policy
  • Contact Us
Ibom FocusIbom Focus
Home»News»Business»TCN Begins The Construction Of A Turn-In Turn-Out To Connect The New Bauchi Transmission Substation to the Grid
Business

TCN Begins The Construction Of A Turn-In Turn-Out To Connect The New Bauchi Transmission Substation to the Grid

Ibom FocusBy Ibom FocusJune 12, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
SHARE THIS:
TCN Begins The Construction Of A Turn-In Turn-Out To Connect The New Bauchi Transmission Substation to the Grid

The Transmission Company of Nigeria (TCN) has commenced the construction of a turn-in-turn-out along the 330kV Jos-Bauchi-Gombe transmission line to connect the new Bauchi 330kV Transmission Substation to the grid. Work began today, June 10, 2025, and is expected to be completed by June 14, 2025.

During the construction period, Gombe and Biu Transmission Substations will receive power through the Dadin-Kowa Hydro Power Plant and Maiduguri Substation, supported by the Maiduguri Emergency Power Plant (MEPP). As a result, there will be a temporary reduction in bulk electricity supply to Jos and Yola Electricity Distribution Companies for onward distribution to their customers in Bauchi, Gombe, Ashaka, Savannah, Damaturu/Potiskum, and Biu. Only Yola and Jalingo will, however, experience full power outages during the five-day project duration.

A new transmission tower is also being installed to enhance the resilience and flexibility of the network, allowing the Bauchi and Gombe Substations to act as mutual backups in the event of maintenance or fault Additionally, Jos will be able to supply Bauchi Substation directly through a 132kV transmission line whenever the primary 330kV connection via Gombe is unavailable. This arrangement enhances power reliability, diversifies transmission routes, and improves emergency response efficiency.

TCN remains committed to strengthening Nigeria’s electricity infrastructure to facilitate a more stable and effective bulk power supply. The company appeals for the patience of affected consumers during the period and assures that normal electricity delivery will resume immediately after the project’s completion.

SHARE THIS:
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Ibom Focus
  • Website

Related Posts

BREAKING: No Substantial Reason to Stop New Tax Laws — Tinubu Blows Hot

December 30, 2025

How Muslims Exempted From Tinubu’s Tax Payment 

December 24, 2025

China Pledges Support For Nigeria’s Port Modernisation, Automation Projects

November 25, 2025
Tag Cloud
2024 Budget AFCON 2023 APC Army Assassination Catholic Church CBN Christian Genocide Climate Change Coup Plot Davido DNA Test Donald Trump Economic Hardship EFCC Election Results Flat Earth Fuel Subsidy Future of News Golden Globes Governorship Election Gyado T Emmanuel Lawmaker Market Stories Minimum Wage Ministerial Appointment Ministerial List Mohbad MotoGP 2017 Mr. Robot Nationwide Strike NLC President Obasanjo PDP PDP Chairman Pregnant Woman Presidential Election Presidential Yacht Rivers Crisis Senate Sillicon Valley Terrorists Tinubu United Stated US




Recent Posts
  • BREAKING: FG Announces 30-Day Petrol Discount at NNPC Filling Stations October 8, 2026
  • “We’re Supporting Tinubu Because He Is Yoruba, Not Because Everything Is Going Well” — Elder Says, Tells Peter Obi What To Do October 8, 2026
  • BREAKING: NAF Aircraft Lands on Farm in Benue After Mission Against Suspected Kidnappers October 8, 2026
  • Umahi: FG’s Road Investments to Unlock Economic Opportunities Across Nigeria October 8, 2026
  • Customs CG Adeniyi Pledges Support for Nigeria’s $1tn Economy Target October 8, 2026
Search
Ibom Focus
Facebook X (Twitter) Instagram Pinterest Vimeo YouTube
  • About Us
  • Disclaimer
  • Corrections Policy
  • Editorial Policy
  • Terms and Conditions
  • Privacy Policy
  • Contact Us
© 2026 Ibom Focus. Designed by Domo Tech Media.

Type above and press Enter to search. Press Esc to cancel.