Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    Ibom FocusIbom Focus
    Subscribe
    • Homepage
    • About Us
    • Big Story
      • Crime
      • General News
      • Foreign News
      • Education
      • Politics
    • Disclaimer
    • Corrections Policy
    • Editorial Policy
    • Terms and Conditions
    • Privacy Policy
    • Contact Us
    • Homepage
    • About Us
    • Big Story
      • Crime
      • General News
      • Foreign News
      • Education
      • Politics
    • Disclaimer
    • Corrections Policy
    • Editorial Policy
    • Terms and Conditions
    • Privacy Policy
    • Contact Us
    Ibom FocusIbom Focus
    • Homepage
    • About Us
    • Big Story
    • Disclaimer
    • Corrections Policy
    • Editorial Policy
    • Terms and Conditions
    • Privacy Policy
    • Contact Us
    Home»Big Story»PHOTOS: TCN Upgrades Agbara 132/33kV Transmission Substation
    Big Story

    PHOTOS: TCN Upgrades Agbara 132/33kV Transmission Substation

    Ibom FocusBy Ibom FocusMarch 19, 2025No Comments1 Min Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email
    SHARE THIS:
    PHOTOS: TCN Upgrades Agbara 132/33kV Transmission Substation

    The Transmission Company of Nigeria (TCN) hereby notifies the public that it is undertaking an upgrade of its 2x45MVA to 2x100MVA Power Transformers at its Agbara 132/33kV Transmission Substation in Ogun State, under the Lagos Region.

    The upgrade aims to increase the substation’s capacity to meet the growing electricity demand in Agbara and its environs, driven by industrialization in the area. Upon completion, three additional feeders will be radiated from the upgraded transformers, enabling Eko Electricity Distribution Company to increase supply to its customers in the area.

    To minimize disruption, TCN is replacing one 45MVA power transformer with a 100MVA transformer, with the second one still in the circuit to ensure minimal load shedding during the upgrade. Once completed and energized, the second 45MVA transformer will then be upgraded to 100MVA, increasing the substation’s total capacity from 150MVA to 260MVA.

    We appeal to electricity consumers taking supply from Agbara 132/33kV Transmission Substation to bear with us during the upgrade period, as there may be temporary load shedding. We assure you that normal electricity supply will be restored as soon as the upgrade is completed.

    Ndidi Mbah
    GM, Public Affairs
    18/3/25

    SHARE THIS:
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Ibom Focus
    • Website

    Related Posts

    Tinubu Extends Tenures of Immigration, Correctional Service Chiefs 

    October 19, 2026

    BREAKING: Former Delta State Governor Is Dead

    October 19, 2026

    BREAKING: Terrorists Attack Traders Travelling Under Nigerian Army Escort, Dozens Feared Dead

    October 12, 2026
    Tag Cloud
    2024 Budget AFCON 2023 APC Army Assassination CBN Christian Genocide Climate Change Coup Plot Crude Oil Davido Donald Trump Economic Hardship EFCC Election Results Flat Earth Fuel Subsidy Future of News Golden Globes Gyado T Emmanuel Lawmaker Market Stories Minimum Wage Ministerial Appointment Ministerial List Mohbad Money Laundering MotoGP 2017 Mr. Robot NAF Nationwide Strike Obasanjo PDP PDP Chairman Power Supply Pregnant Woman Presidential Election Presidential Yacht Rivers Crisis Senate Sillicon Valley Terrorists Tinubu United Stated US




    Recent Posts
    • Works Ministry Celebrates Retiring Procurement Director, Belel, Commends Contributions to Infrastructure Development November 3, 2026
    • EFCC: Court Jails 18-Year-Old Applewood Estate Suspect Over $800 Gift Card Fraud November 3, 2026
    • ICPC Tasks Tertiary Institutions on Stronger Controls, Accountability in TETFund Projects November 3, 2026
    • How I Made Ita Enang Ambassador to Germany – Akpabio November 3, 2026
    • EFCC: Couple Bag 14 Years Jail Term for N67.6m Fraud in Lagos November 3, 2026
    Search
    Ibom Focus
    Facebook X (Twitter) Instagram Pinterest Vimeo YouTube
    © 2026 Ibom Focus. Designed by Domo Tech Media.

    Type above and press Enter to search. Press Esc to cancel.