Close Menu
  • Home
  • Akwa ibom
  • Big Story
  • Education
  • Recruitment
  • Uncategorized
Facebook X (Twitter) Instagram
  • About Us
  • Disclaimer
  • Corrections Policy
  • Editorial Policy
  • Terms and Conditions
  • Privacy Policy
  • Contact Us
Facebook X (Twitter) Instagram
Ibom FocusIbom Focus
Subscribe
  • Homepage
  • About Us
  • Big Story
    • Crime
    • General News
    • Foreign News
    • Education
    • Politics
  • Disclaimer
  • Corrections Policy
  • Editorial Policy
  • Terms and Conditions
  • Privacy Policy
  • Contact Us
Ibom FocusIbom Focus
Home»Big Story»PHOTOS: TCN Upgrades Agbara 132/33kV Transmission Substation
Big Story

PHOTOS: TCN Upgrades Agbara 132/33kV Transmission Substation

Ibom FocusBy Ibom FocusMarch 19, 2025No Comments1 Min Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
SHARE THIS:
PHOTOS: TCN Upgrades Agbara 132/33kV Transmission Substation

The Transmission Company of Nigeria (TCN) hereby notifies the public that it is undertaking an upgrade of its 2x45MVA to 2x100MVA Power Transformers at its Agbara 132/33kV Transmission Substation in Ogun State, under the Lagos Region.

The upgrade aims to increase the substation’s capacity to meet the growing electricity demand in Agbara and its environs, driven by industrialization in the area. Upon completion, three additional feeders will be radiated from the upgraded transformers, enabling Eko Electricity Distribution Company to increase supply to its customers in the area.

To minimize disruption, TCN is replacing one 45MVA power transformer with a 100MVA transformer, with the second one still in the circuit to ensure minimal load shedding during the upgrade. Once completed and energized, the second 45MVA transformer will then be upgraded to 100MVA, increasing the substation’s total capacity from 150MVA to 260MVA.

We appeal to electricity consumers taking supply from Agbara 132/33kV Transmission Substation to bear with us during the upgrade period, as there may be temporary load shedding. We assure you that normal electricity supply will be restored as soon as the upgrade is completed.

Ndidi Mbah
GM, Public Affairs
18/3/25

SHARE THIS:
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Ibom Focus
  • Website

Related Posts

BREAKING: US Delegation Visits Nnamdi Kanu at Sokoto Detention Facility

January 9, 2026

BREAKING: Nigerian Govt Cancels ‘Cross-over Night’ Activities 

December 31, 2025

FG Confirms U.S.-Backed Airstrikes On Terrorist Camps In Nigeria 

December 26, 2025
Tag Cloud
2024 Budget AFCON 2023 APC Army Assassination Catholic Church CBN Christian Genocide Climate Change Coup Plot Davido DNA Test Donald Trump Economic Hardship EFCC Election Results Flat Earth Fuel Subsidy Future of News Golden Globes Governorship Election Gyado T Emmanuel Lawmaker Market Stories Minimum Wage Ministerial Appointment Ministerial List Mohbad MotoGP 2017 Mr. Robot Nationwide Strike NLC President Obasanjo PDP PDP Chairman Pregnant Woman Presidential Election Presidential Yacht Rivers Crisis Senate Sillicon Valley Terrorists Tinubu United Stated US




Recent Posts
  • “We’re Supporting Tinubu Because He Is Yoruba, Not Because Everything Is Going Well” — Elder Says, Tells Peter Obi What To Do October 8, 2026
  • BREAKING: NAF Aircraft Lands on Farm in Benue After Mission Against Suspected Kidnappers October 8, 2026
  • Umahi: FG’s Road Investments to Unlock Economic Opportunities Across Nigeria October 8, 2026
  • Customs CG Adeniyi Pledges Support for Nigeria’s $1tn Economy Target October 8, 2026
  • ‘We Are Here to Promote APC, Nothing Else’ Tinubu’s Wife Rejects Wike October 8, 2026
Search
Ibom Focus
Facebook X (Twitter) Instagram Pinterest Vimeo YouTube
  • About Us
  • Disclaimer
  • Corrections Policy
  • Editorial Policy
  • Terms and Conditions
  • Privacy Policy
  • Contact Us
© 2026 Ibom Focus. Designed by Domo Tech Media.

Type above and press Enter to search. Press Esc to cancel.