Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    Ibom FocusIbom Focus
    Subscribe
    • Homepage
    • About Us
    • Big Story
      • Crime
      • General News
      • Foreign News
      • Education
      • Politics
    • Disclaimer
    • Corrections Policy
    • Editorial Policy
    • Terms and Conditions
    • Privacy Policy
    • Contact Us
    • Homepage
    • About Us
    • Big Story
      • Crime
      • General News
      • Foreign News
      • Education
      • Politics
    • Disclaimer
    • Corrections Policy
    • Editorial Policy
    • Terms and Conditions
    • Privacy Policy
    • Contact Us
    Ibom FocusIbom Focus
    • Homepage
    • About Us
    • Big Story
    • Disclaimer
    • Corrections Policy
    • Editorial Policy
    • Terms and Conditions
    • Privacy Policy
    • Contact Us
    Home»Crime»REVEALED: DOCUMENTS: How Engineering Firm Withdrew Further Services From Collapsed 21-storey Lagos Building, Full Details
    Crime

    REVEALED: DOCUMENTS: How Engineering Firm Withdrew Further Services From Collapsed 21-storey Lagos Building, Full Details

    Ibom FocusBy Ibom FocusNovember 2, 2021No Comments4 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email
    SHARE THIS:
    REVEALED: DOCUMENTS: How Engineering Firm Withdrew Further Services From Collapsed 21-storey Lagos Building, Full Details

    Ibom Focus brings to you How Engineering Firm Withdrew Further Services From Collapsed 21-storey Lagos Building

    An engineering firm, Prowess Engineering Limited has since February 2020 withdrawn its services from the construction of the 20-storey building – 360 Degrees – that collapsed in Lagos on Monday, SaharaReporters has learnt.

    Documents obtained by SaharaReporters on Monday show the firm had withdrawn its services since early 2020 as stated in a letter in which the company expressed concerns over the way the project was being handled.

    21-storey Lagos Building

    21-storey Lagos Building
    21-storey Lagos Building

    The letter is dated February 20, 2020, and titled: Re: Proposed Gerrard Terraces For Fourscore Limited.

    Addressed to Mr Femi Osibona of Fourscore Heights Limited, 44BCD Gerrard Road, Ikoyi, Lagos, the letter, signed by the Managing Director of Prowess Engineering Limited, Muritala Olawale, formally stated that the firm had withdrawn its services from the project and would not be held liable for any errors in the construction.

    It reads, “This letter is to formally inform you of the withdrawal of our structural consultancy service from the above named project. We arrived at this decision due to the fact that we no longer share the same vision with you as our client in terms of how the project is being executed.

    “We can guarantee the integrity of the first two buildings and also works done up to the fourth floor of the third building supervised by us provided specifications have been met in terms of the required concrete strength. This we do not have control over as we do not have the concrete cube test results for each stage of the building till date.

    “Also, kindly note that we are not taking responsibilities for any other construction errors that may have occurred overtime on the project.

    “Furthermore, we request that our company’s name and logo be removed from the project board and also kindly notify all necessary approving authorities of our withdrawal from the project.

    21-storey Lagos Building

    21-storey Lagos Building
    21-storey Lagos Building

    “We regret this decision and the lost opportunity to do business together. We look forward to future cooperation in other projects.”

    It had also learnt that four others were rescued from the rubble of the building, identified as 360 Degrees.

    Earlier when contacted the spokesman for the National Emergency Management Agency (NEMA), Mr. Ibrahim Farinloye, he said the number of casualties could not be provided as rescue efforts were still ongoing.

    Meanwhile, an advertorial promo of the project tagged ‘Luxury in the Sky’ reveals details of the collapsed structure.

    It shows the project was planned for people looking to have a ‘7-star hotel experience living in the heart of Ikoyi’.

    It says, “360 degrees offers Luxury high rise 4 bedroom maisonettes, flats, duplex and penthouses on Gerrard Road, Ikoyi, Lagos.

    “The 20-floor strictly residential facility is the brain-work of Fourscore Homes, evolving from a desire to build an original masterpiece. The concept is to have serviced flats in the three towers for residents to experience a stress-free lifestyle, complete with a hotel flair with a 360-degree view of Lagos State.”

    It notes that the features include open outdoor recreation with outdoor television, gym, and swimming pool.

    Also, according to the information provided, the expected delivery date was 2022 while the stage of development before the collapse was put at 80 percent completed.

    At the time, 65 percent of the spaces had been sold, with the price starting from $1.2 million (about N688 million at the black market rate of N573 to $1) and the penthouse price starting from $5 million (about N2.9 billion

    21-storey Lagos Building

    SHARE THIS:
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Ibom Focus
    • Website

    Related Posts

    NDLEA Arrests Woman With 266 Rounds Of AK-47 Ammunition Along Abuja-Kaduna Expressway

    November 1, 2026

    Two Europe-Based Nigerians Arrested At Abuja Airport With 200 Cocaine Wraps In Their Stomachs

    November 1, 2026

    BREAKING: Celestial Church Pastor In Trouble Over Alleged S£xual Abuse Of 16-Year-Old Stepdaughter, Thr£atens To Ki|| Her If She Reports Him

    October 31, 2026
    Tag Cloud
    2024 Budget AFCON 2023 APC Army Assassination CBN Christian Genocide Climate Change Coup Plot Crude Oil Davido Donald Trump Economic Hardship EFCC Election Results Flat Earth Fuel Subsidy Future of News Golden Globes Gyado T Emmanuel Lawmaker Market Stories Minimum Wage Ministerial Appointment Ministerial List Mohbad Money Laundering MotoGP 2017 Mr. Robot NAF Nationwide Strike Obasanjo PDP PDP Chairman Power Supply Pregnant Woman Presidential Election Presidential Yacht Rivers Crisis Senate Sillicon Valley Terrorists Tinubu United Stated US




    Recent Posts
    • NDLEA Arrests Woman With 266 Rounds Of AK-47 Ammunition Along Abuja-Kaduna Expressway November 1, 2026
    • Nigeria Customs Showcases B’Odogwu, AI-Driven Operations At 2026 WCO Global Event November 1, 2026
    • Nigeria Customs Deploys AI Tools to Combat Fake News, Online Scams November 1, 2026
    • Customs Partners Six Agencies to Strengthen Fight Against Money Laundering, Terrorism Financing November 1, 2026
    • Speaker Abbas Flags Off Education, Healthcare, Security Projects in Kaduna November 1, 2026
    Search
    Ibom Focus
    Facebook X (Twitter) Instagram Pinterest Vimeo YouTube
    © 2026 Ibom Focus. Designed by Domo Tech Media.

    Type above and press Enter to search. Press Esc to cancel.